🏭 Schedule M compliance deadline 2026 — book your free pharma compliance audit today

PARAM-COMPLY

Schedule M 2026, CPCB and IATF compliance — automated, audit-ready, and always inspection-day ready.

From₹3.5L₹15L
Overview

Inspection-Ready, Every Single Day

The revised Schedule M kicks in for Indian pharma MSMEs in 2026 — and a failed audit can mean a suspended licence and ₹10–50L in exposure, not to mention lost contracts. PARAM-COMPLY replaces the binders, WhatsApp photos and spreadsheet checklists with a single digital system: auto-generated, audit-ready reports; 21 CFR Part 11-aligned electronic records with full audit trails; automated cold-chain logging; digital checklists with evidence capture; and closed-loop NCR/CAPA tracking. It gives you MasterControl-grade documentation discipline at roughly a quarter of the price, deployed by engineers who actually walk your floor.

What You Get

Compliance Without the Paperwork Army

  • Auto-generated, audit-ready reports for Schedule M, CPCB & IATF
  • 21 CFR Part 11-aligned electronic records with tamper-evident audit trail
  • Automated cold-chain temperature & humidity logging with deviation flags
  • Digital checklists with photo & signature evidence capture
  • Closed-loop NCR/CAPA tracking — root cause to verification, all logged
  • Schedule M 2026 readiness assessment & gap-closure workflow
  • Role-based e-signatures and access control for every record
  • One-click evidence pack export for auditors & regulators
Same Discipline. 4× Cheaper.

PARAM-COMPLY vs MasterControl

CapabilityMasterControlPARAM-COMPLY
Platform cost₹15L + steep annual licencesFrom ₹3.5L ✓
Schedule M 2026 templatesGeneric, US-FDA-centricIndia Schedule M-native ✓
21 CFR Part 11 e-recordsYesYes — aligned ✓
NCR/CAPA closed loopYesYes, included ✓
Cold-chain loggingThird-party add-onBuilt in ✓
Implementation & supportOffshore, ticket-basedOn-site Indian engineers ✓
Standards & Frameworks

Aligned to What Auditors Ask For

Schedule M 2026 21 CFR Part 11 CPCB Reporting IATF 16949 Audit Trail Cold-Chain Logging NCR / CAPA Role-Based E-Signature

Beat the Schedule M 2026 Deadline

Book a free compliance audit — our engineers map your gaps against Schedule M, CPCB and IATF, then show you the exact path to inspection-ready.

✓ Opening your email — we respond within 4 working hours.